Infrastructure and construction projects.
A project site is a moving target: the workforce turns over, the geography changes month by month, and cover is needed from the first week rather than when the site office is finished. What has to travel is not just an ambulance but the obligation register and the health record of every worker on the muster roll.
Physician and safety engineer Two-week assessment Every register, obligation by obligation No obligation
What hurts people here
The hazard, before the package
- Transient workforces
- Pre-employment screening at scale, fast enough not to hold up mobilisation, with a record that follows the worker across the project.
- Falls and struck-by
- The two injuries that dominate the statistics. Response protocols written for height and for plant movement, drilled quarterly.
- Temporary sites
- Cover that mobilises in weeks from a containerised unit and moves as the works move.
- Multiple contractors
- One medical and compliance arrangement across the site rather than one per contractor, so nobody falls between two of them.
Where the obligation bites
Statutory reading
Where a project registers as a factory, the Factories Act thresholds apply as they would anywhere; where it does not, the client’s own contractual EHS requirements usually set a higher bar than the statute. The assessment reads whichever governs.
Which provisions apply to your site?
The assessment maps them provision by provision, marks the gaps in whatever arrangement is in place now, and hands you the register to keep — whether or not you appoint Statura.
What Statura operates on a site like yours
The service
- Occupational health
- The centre the site is required to have, designed, fitted out, staffed on every shift and then run.
- Emergency response
- A nurse at the incident in five minutes, a physician on the line in ten, an ambulance departing in fifteen, entered as a schedule to the agreement.
- Compliance and safety
- A live obligation register with a date and an owner on every line, the statutory safety roles filled, audits and quarterly drills.
Questions
How quickly can cover be mobilised on a new site?
Weeks. A mobile medical unit is specified from the assessment, built and stocked, and staffed in parallel, so it is operational from the day it is set down rather than waiting on recruitment.
Can one arrangement cover several contractors on the same site?
Yes, and it is usually the better arrangement. One centre, one response protocol and one register across the site means no worker falls between two contractors' arrangements, and the principal employer holds one accountable name rather than several.
Related
Elsewhere on this site
- All sectors How cover is shaped to each hazard before it is priced.
- Mobile medical units Where no room exists, or the site moves.
- Compliance and safety The register, the statutory roles and the monthly report.
Start with one site.
Send us one site. A physician and an industrial safety engineer walk it over two weeks and hand back a written report: the statutory obligations that apply, where the current arrangement falls short, the staffing and equipment required, and a recommended operating model. No charge, no obligation, and the report is yours to keep either way.
- Medical assistance
- +91 95383 71985
+91 81688 67102 - Enquiries
- prabhat@statura.co.in
- Entity
- Statura Health LLP
Industrial sites across India